• With pylons reaching 182 m tall, the cable-stayed bridge over the Tiger Valley is India’s highest and forms a vital part of the Pune-Mumbai Missing Link Project.
• The four cranes were acquired and erected by Afcons in 2021, with jib lengths of 50 m.
• Their ease of transport helped to mitigate the difficult road conditions on the way to the site.