Skip to main content Skip to main navigation Skip to search

MDT 809 M32

THE TOPLESS CRANE WITH THE HIGHEST CAPACITY

Equipped with the new Crane Control System the MDT 809 M32 provides greater performances. This user-friendly crane control system offers owners the highest levels of comfort flexibility ergonomic control – translating to better return on investment.
MDT CCS Topless concept allows complex multi-crane installations. The assembly erection transport and even maintenance phases are shortened. Optimum productivity and greater safety make MDT CCS cranes the best alternative for all users and hirers.

Features

  • Crane Control System (CCS)

    Manitowoc Crane Control System (CCS) – Offers a user-friendly interface, full graphic display, ergonomic controls, a jog dial for easier navigation and data input, and parts commonality across Grove, Manitowoc and Potain product lines enhancing operator familiarization and serviceability.

  • Potain Cab-IN

    Potain Cab-IN

    Potain Cab-IN, the new Potain cranes operator lift
    Access ladders installed in parallel to the operator lift
    Operator lift developed with our partner GEDA

  • Top Tracing 3

    Top Tracing 3 Anticollision System

    Anticollision System - Device for controlling working zones and interference between cranes.

Specifications

  • Description

    Groundbreaking performances for a Topless

    • Specific design based on the Topless concept with low space requirements to adapt to multi-crane jobsites
    • High working heights obtained through newly developed installation bases and mast sections:
    • Integrated CCS control system

    Optimized and economical transport

    • Compact size and limited weight of each of the crane elements
    • 11 convoys at the most for transportation of the whole slewing crane part with a 80 m jib.

    Fastest 40 t tower crane assembly

    • Simple and rapid unfolding of the ballast cage
    • Wired towerhead/cab assembly fitted just once (no intersite dismantling)
    • Cathead/jib foot is single element
    • Modular jib without tie bars: several configurations are possible; lighter package weights with quick and easy handling
    • Cross-shaped base comprised of a main girder and 2 half cross-girders connected easily using pins
    • Quick and easy commissioning adjustment of safety devices done in cab on the CCS screen

Similar products

News