MDT 269 J10
Equipped with the new Crane Control System the MDT 269 J10 provides greater performances. This user-friendly crane control system offers owners the highest levels of comfort flexibility ergonomic control – translating to better return on investment.
MDT CCS Topless concept allows complex multi-crane installations. The assembly erection transport and even maintenance phases are shortened. Optimum productivity and greater safety make MDT CCS cranes the best alternative for all users and hirers.
Features
Crane Control System (CCS)
Manitowoc Crane Control System (CCS) – Offers a user-friendly interface, full graphic display, ergonomic controls, a jog dial for easier navigation and data input, and parts commonality across Grove, Manitowoc and Potain product lines enhancing operator familiarization and serviceability.
Potain Cab-IN
Potain Cab-IN, the new Potain cranes operator lift
Access ladders installed in parallel to the operator lift
Operator lift developed with our partner GEDA75 HPL™
75 HPL™ - High Performance Lifting™
Hoisting winch available in four versions (10t-16t)Top Tracing 3
Anticollision System - Device for controlling working zones and interference between cranes.