Potain the world leader of the tower crane now sells a range of models perfectly adapted to each type of construction. These products are based on the latest technologies and are associated with a complete set of equipment.
• The cranes are building the main section of the cable-stayed bridge with a total length of 1,410 ft (430 m), lifting thousands of tons of concrete and steel.
• The bridge connects to nearly 4,934 ft (1,504 m) of elevated access viaducts on both sides. ETAC, the Potain sales and rental specialist based in Lima, leads the project’s operations.