• A Potain MD 365 B L16 and MD 208 A are together constructing the 120 m GIOIA 22 “Shard of Glass” tower, UBI Banca’s new zero-energy headquarters in Porta Nuova, Milan.
• Contractor Colombo Costruzioni collaborated with Manitowoc Lift Solutions to carefully position the cranes on the jobsite, leaving space for them to overlap and be easily disassembled afterwards to meet developer COIMA SRG’s deadlines.