Producto no actual
MDT 368 A L12
- 307.415pies 93.7m
- 13.2277T 12t
- 246.063pies 75m
- 7.05479T 3.2t
Noticias
Four Potain MDT tower cranes become integral part of famous Minneapolis bridge’s history — and also its structure
• With conventional crane solutions off the table for a variety of reasons, restoration of the historic Minneapolis Third Avenue bridge called for an innovative new approach.
• Potain MDT topless cranes were built into the piers of the bridge, as traditional anchoring solutions would have required too much space.
• The solution is working so well that the contractors plan to take it into consideration right from the start of future bridge projects — even where more typical solutions would fit.